Boeing Australia Limited
Executive Summary
My decision is to continue on the same course that Boeing Australia Limited (BAL) is on. I feel, after reading this case study that BAL has been on the correct path with regard to building their systems architecture. There is a need for a more sophisticated procurement process and the issue of a procurement application may be easily found. The key is the process by which BAL has implemented all other IT applications, they have been very successful. They are thorough and have processes in place to rationalize whether a new by-in application or an in-house developed program would be best. My thought is that at least one, if not more; of the current systems have an appropriate off the shelf application that would work for BAL’s procurement needs. Further investigation through the Materials Management Process Council should reveal an appropriate tool for BAL to use. In this case study I will outline the reasons for my decision and some of the potential cost savings involved.
Statement of Issues
The main issue of this case is to buy a new e-procurement application or to continue to wait for the best case scenario application to come along. It is an important decision that affects many aspects of the business. The potential to lose a client or a critical supplier is possible during this process. An in depth analysis of the situation must be conducted prior to any move toward a process change. Initially, change is difficult in any organization. A new process or system could require retraining or reassignment of staff. Externally, the client may lose faith in the supplier if continued shortages or delays occur during the implementation period of a new process.
Criteria
There are many characteristics to a good decision in this case. The first would be if the outcome was cost neutral or within the budget laid out…...

Similar Documents

Boeing

...AeromAgAzine building better communication New Air Traffic Surveillance Technology complying with the Aging Airplane Safety rule new tool for collaboration on in‑Service issues Fuel conservation Strategies: Descent and Approach AERO cover photo: 777 APU exhaust bay. AERO contents 03 building better communication Four years ago, we reintroduced AERO magazine in response to a boeing customer support survey. late last year, we went back to you to find out how well we are doing. 07 New Air Traffic Surveillance Technology Air traffic service providers and regulators are moving toward airspace and flight operations to enable greater flexibility and adaptability along with assuring improved traffic flow, capacity, efficiency and safety. A key part is the transition from radar to ADS‑b surveillance. 07 15 complying with the Aging Airplane Safety rule new materials help operators comply with the u.S. Federal Aviation Administration’s new rule on aging airplane safety. 21 15 new tool for collaboration on in‑Service issues 21 boeing introduces a new collaboration platform that integrates two previous elec‑ tronic bulletin boards in a single application and includes a number of new features. 25 Fuel conservation Strategies: Descent and Approach 25 www.boeing.com/c o m m e r c i A l / A e r o m A g A z i n e the descent and approach phases of flight are the flight crew’s final opportunities to......

Words: 10353 - Pages: 42

Collaboration Systems at Isuzu Australia Limited

...Collaboration Systems at Isuzu Australia Limited By: Christopher Folz Jr. Instructor: Nancy Romero Management Information Systems 3/3/2012 Some companies try to implement new ideas and ways to increase efficiency and productivity in the workplace. This is a great idea for companies to increase the output of the product or service they are performing for the consumers. However, not everything goes so well when implementing new ideas. There are hardships that need to be overcome, the costs of implementing a new system can be overwhelming at first, and many others. I will describe to you some of the hardships of adding new groupware to a system that is already in place. Also have you ever wondered what a wiki does or what it could do for you? Well I in this paper you may find your answer. Let us start with some of the hardships of implementing new groupware into a system. First the costs can be frightening when you see it. By this I mean that the new groupware will require training for the personnel using it. So you will have to pay to have someone come in and train the new personnel. You also will lose efficiency at first while everyone is trying to learn the system and that causes a loss in productivity. Also you would have to purchase the groupware in most cases and that is not so bad if it is for only a few systems, but when you are buying I for an entire network of systems than it can start adding up pretty quickly. Second problem to overcome is resistance. By......

Words: 1133 - Pages: 5

Boeing

...Boeing is the world's largest aerospace company and leading manufacturer of commercial jetliners and defense, space and security systems. A top U.S. exporter, the company supports airlines and U.S. and allied government customers in 150 countries. Boeing products and tailored services include commercial and military aircraft, satellites, weapons, electronic and defense systems, launch systems, advanced information and communication systems, and performance-based logistics and training. Boeing has a long tradition of aerospace leadership and innovation. The company continues to expand its product line and services to meet emerging customer needs. Its broad range of capabilities includes creating new, more efficient members of its commercial airplane family; integrating military platforms, defense systems and the warfighter through network-enabled solutions; creating advanced technology solutions; and arranging innovative customer-financing options. With corporate offices in Chicago, Boeing employs more than 170,000 people across the United States and in 70 countries. This represents one of the most diverse, talented and innovative workforces anywhere. More than 140,000 employees hold college degrees -- including nearly 35,000 advanced degrees -- in virtually every business and technical field from approximately 2,700 colleges and universities worldwide. Our enterprise also leverages the talents of hundreds of thousands more skilled people working for Boeing suppliers......

Words: 6266 - Pages: 26

Boeing Australia Limited

...Table of contents Page Executive Summary 2 Immediate issues 3 Environment and Root cause analysis 4 Recommendation 5 & 6 Recommendation and implementation 7 Monitor & Control 8 Conclusion 8   EXECUTIVE SUMMARY Boeing Australia Limited (BAL) was formed in late 1996, relatively new company and a global extension of the U.S. firm. The Boeing Co. developed capabilities in the areas of space and communications, site management, and the upgrade and maintenance of military aircraft and equipment. As BAL grew, so did the legacy information system it used for both internal communications and external dealings with customers. BAL, however, faced difficult decisions as it sought to upgrade its procurement systems and processes to improve operations. In early 1999, BAL recruited a new national procurement manager, Russell Menere. His immediate task was to look for gains in productivity by improving procurement processes, either through cost savings or by reduced processing time. To meet this objective, he initiated a number of short-term improvements. These included the rationalization of number of BAL's suppliers, improving BAL's relationships with its key suppliers; the introduction of a credit-card purchasing system for low-value, large-volume consumables and the adoption of electronic ordering processes with BAL's larger suppliers. In 2002, with new opportunities available through e-business technology, Russell needs to decide......

Words: 1752 - Pages: 8

Boeing Australia Ltd Case Study

...Options Recommendation and Implementation Monitor and control Conclusion Executive Summary Boeing is the world’s leading aerospace company and the largest manufacturer of commercial jetliners and military aircraft combined, providing products and tailored services to airlines and U.S. and allied armed forces around the world. BAL’s capabilities include rotorcraft, electronic and defense systems, missiles, satellites, launch systems and advanced information and communication systems. BAL’s reach extends to customers in more than 90 countries around the world, and they are a leading U.S. exporter in terms of sales. With corporate offices in Chicago, Boeing employs more than 159,300 people in 49 American states and 70 countries. Their enterprise also leverages on talents of hundreds of thousands more people working for Boeing suppliers worldwide. BAL however faced difficulties as it sought to upgrade its procurement systems and processes to improve operations. Russell, the new National Procurement Manager on realizing the new opportunities available through e-business technology, Russell needed to decide what BAL’s next step should be, should BAL invest in new system that would simplify procurement processes; should BAL sit on the fence? I am Russell Menere, the National Procurement Manager for Boeing Australia Limited (BAL)., my decision is to recommend that BAL pursue a cost effective e-procurement system that will interface with the......

Words: 1826 - Pages: 8

Australia Beverage Limited

...(manufacturer) → delivering (logistics) → merchandising and retailing → marketing → consumers DRIVERS of industries in aus: * health awareness: increasing awareness of obesity problem in aus * convenience factor: traveling for biz or leisure, popular pack size 600ml * other drivers not applicable for aus: climate, lack of clean drinking water (mexico, united arab emirates), fashion (france, italy, austria)   THREAT: * environmental awareness: impact of bottles (plastic) on landfill, carbon output of production and distribution * substitute: tap water (low environmental impact, cheaper, readily available) * water imports: low threat due to high volume and low unit value of water INDUSTRY SEGMENTATION in AUSTRALIA: 1) STILL water: * 86% of consumption volume in 2013 * drivers: diet choice, healthier choice, substitute of tap water, convenience for traveling/leisure activities 2) SPARKLING water: * 14% consumption volume * drivers: refreshment drink when dining out, image of premium products INDUSTRY LIFE CYCLE: potential for higher rate of consumption and sales growth before it reaches maturity → GROWTH STAGE, current levels of profitability are expected to continue. * new competitors, rivalry is low * relatively low buyer power due to supply shortfall * short of cash (not cash cow) as funds are invested in expansion and catered for high-growth rates * organization concerns with keeping up with......

Words: 1746 - Pages: 7

Bal Boeing Australia Ltd

...IDENTIFICATION…………………………………………………1 ENVIRONMENTAL AND ROOT CAUSE….………..……………….….1 ALTERNATIVES AND OPTIONS……………………………………..…2 RECOMMENDATION …………….………………………………………3 MONITOR AND CONTROL…………………..……………………….....4 Executive Summary BAL is considering options for e-procurement and trying to decide if they need to find a new system that they can integrate with their current legacy ERP and other software. The following report will present an approach to continue with incremental changes to their current strategy. The organization has achieved much in a short period of time and I expect they can improve upon the foundation of what they have by further development of their current software and processes. Issue Identification Boeing Australia Ltd. (BAL) Need to decide if they will move forward with finding, purchasing and implanting an e-procurement system that will integrate with their current legacy systems. The current systems manage their procumbent, inventory, work in process, time capture, and finical. BAL has goals that will improve the supply chain extensively. They are looking to: reduce the amount of suppliers they have, improved relationships with their suppliers, reduce costs, reduction in rogue purchasing, and standardize best practices for procurement. BAL has already taken many steps to meet their goals and is achieving headway. By moving procurement, administration finance, engineering, logistics projects, and IT for 4 of......

Words: 893 - Pages: 4

Boeing Australia

...increase customer values BAL has to remain strategically competitive Analysis After analysing the BAL’s current procurement situation we have come to the following analysis. •Credit Card Purchase •Managing Supplier Relationships •Information Systems •Reverse Auction •All the above areas can be enhanced Credit Card Purchase: The credit card purchasing strategy is currently limited to in direct spend only. Managing Supplier Relationships: The ADF mandated requirement of tractability of “fly-away” parts has initiated the process of certifying all suppliers. Information Systems: The current legacy systems of BAL though functional does not have the capabilities of meeting the ADF requirements for real time, web based status reporting on contracted projects. Material Management Process Council: The formation of MMPC at BAL is a strategic step to examine supply chain and procurement processes. The members of MMPC from different departments would provide cross-functional support to measure the baseline to establish the practices to streamline and simplify the procurement processes. Reverse Auction: Boeing US uses reverse auctions to procure items. BAL should work in this direction. Lead times could be affected and undermine existing relationships with strategic suppliers. Roles and goals of the procurement team In the circumstances mentioned in the case, the following are the main goals •Gains in productivity •Convert procurement process from manual to......

Words: 524 - Pages: 3

Collaboration Systems at Isuzu Australia Limited

...Collaboration Systems at Isuzu Australia Limited By: Christopher Folz Jr. Instructor: Nancy Romero Management Information Systems 3/3/2012 Some companies try to implement new ideas and ways to increase efficiency and productivity in the workplace. This is a great idea for companies to increase the output of the product or service they are performing for the consumers. However, not everything goes so well when implementing new ideas. There are hardships that need to be overcome, the costs of implementing a new system can be overwhelming at first, and many others. I will describe to you some of the hardships of adding new groupware to a system that is already in place. Also have you ever wondered what a wiki does or what it could do for you? Well I in this paper you may find your answer. Let us start with some of the hardships of implementing new groupware into a system. First the costs can be frightening when you see it. By this I mean that the new groupware will require training for the personnel using it. So you will have to pay to have someone come in and train the new personnel. You also will lose efficiency at first while everyone is trying to learn the system and that causes a loss in productivity. Also you would have to purchase the groupware in most cases and that is not so bad if it is for only a few systems, but when you are buying I for an entire network of systems than it can start adding up pretty quickly. Second problem to overcome is resistance....

Words: 363 - Pages: 2

Boeing Australia Limited Case

...Boeing Australia Limited Case   Boeing Australia Limited Case Report Table of Contents Page Part 1 Executive Summary 2 Part 2 Issue Identification 3 Part 3 Environmental and Root Cause Analysis 3 Part 4 Alternatives and Options 4 Part 5 Recommendations and Implementation 6 Part 6 Monitor and Control 7 Part 7 Conclusion 7   Part 1: Executive Summary Following a detailed examination of Boeing Australia Limited’s current procurement processes, I am recommending that BAL continue to use its existing legacy systems. There is a limited budget at this time to invest in new projects. BAL has done an impressive job initiating many short term improvements and I feel at this time it makes sense to allocate our resources and focus on this continuous improvement program. In order to arrive at this decision, an analysis of the pros and cons of implementing a new e-procurement system was conducted. Due to the large monetary investment required and the overall scale of this project, it is not practical to commit to a new system today. We have been successful at executing many effective changes in the area of procurement and will continue to do so in the future. This will help to streamline our processes, improve customer and supplier relations and most importantly, will ensure that Boeing Australia will meet its long term strategic goals. Russell Menere ...

Words: 1416 - Pages: 6

Collaboration Systems at Isuzu Australia Limited

...Case Study 2: Collaboration Systems at Isuzu Australia Limited Read the case study in Chapter 12 titled “Collaboration Systems at Isuzu Australia Limited”. Write a two to three (2-3) page paper in which you: Summarize the main reason(s) that prompted Isuzu Australia Limited (IAL) to use collaboration technologies. Identify the platform that IAL chose as an online portal and content management system, and describe the main reason(s) why IAL chose such a specific platform. Discuss the significant attributes of a wiki, and describe the overall manner in which IAL uses wikis for its internal collaboration. Speculate on the main challenges that IAL could face when implementing groupware, and suggest one (1) step that IAL could take in order to mitigate the challenges in question. Use at least three (3) quality reference. Note: Wikipedia and other Websites do not qualify as academic resources. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. The specific course learning outcomes associated with this......

Words: 298 - Pages: 2

Case Study 2: Collaboration Systems at Isuzu Australia Limited

...Case Study 2: Collaboration Systems at Isuzu Australia Limited Strayer University CIS109 Matthew Gonzalez Due Date February, 23 2015 Isuzu Australia Limited or IAL is a subsidiary of Isuzu Motors Limited in Japan and are responsible for all things Isuzu Trucks in Australia. The company needed a way to connect their entire dealer network and improve the speed and accuracy of their communications between headquarters and each dealer and other business partners The Need for a new system. Why did they need to update their system and how would they accomplish this in a timely and efficiently manor The reasoning behind getting this communication network up and running is the high priority requirement for access to the latest materials and information from IAL head office (Bigdoli, 2014). In 2005 they distributed all information in printed format and shipped via the Australia Post. The benefits to creating a centralized communication network would be exponential to their productivity, dealers and other business partners would be able to access information and submit issues in real time instead of relying on post. IAL decided to use IBM’s WebSphere portal and Workplace Web Content Management (WCM), along with Lotus Same Time instant messaging, Lotus Quickr for team based project management and Portal Document Manager (PDM) for a central repository of documents. The reasoning behind this was given by the Staff Operations Manager...

Words: 777 - Pages: 4

Boeing

...Introduction Founded by William Boeing in Seattle, Washington, United States on July 15, 1916. Boeing is the world's largest aerospace company and leading manufacturer of commercial jetliners and defence, space and security systems. A top U.S. exporter, the company supports airlines and U.S. and allied government customers in 150 countries. Boeing products and tailored services include commercial and military aircraft, satellites, weapons, electronic and defence systems, launch systems, advanced information and communication systems, and performance-based logistics and training. Boeing employs more than 165,000 people across the United States and in more than 65 countries. What Boeing Does Today • Design, assemble and support commercial jetliners – Boeing 7-series family of airplanes leads the industry – Commercial Aviation Services offers broad range of services to passenger and freight carriers • Design, assemble and support defence systems – World’s largest designer and manufacturer of military transport, tankers, fighters and rotorcraft – Global Services & Support provides services to government customers worldwide • Design and assemble satellites and launch vehicles – World’s largest provider of commercial and military satellites; major service provider to NASA and prime contractor for the International Space Station • Integrate and support large-scale systems, develop networking technology and network-centric solutions • Provide financing solutions......

Words: 1794 - Pages: 8

Part 1 Caltex Australia Limited 4.Docx

...PersonID | Surname | Title | Given Names | Company | Seminar | Section Completed | Marks | 23270683 | Soesanto | Ms. | Pricillia Indah | Caltex | Wednesday, 3-6pm | Part A | | 25023772 | Yang | Ms. | Han | Caltex | Wednesday, 3-6pm | Part B | | 25843001 | Li | Mr. | Kangtai | Caltex | Wednesday, 3-6pm | Part C | | Prepared by: Part A: Pricillia Indah Soesanto 23270683 Part B: Han Yang 25023772 Part C: Kangtai Li 25843001 Prepared by: Part A: Pricillia Indah Soesanto 23270683 Part B: Han Yang 25023772 Part C: Kangtai Li 25843001 CALTEX Australia Ltd: BUSINESS VALUATION GROUP PROJECT CALTEX Australia Ltd: BUSINESS VALUATION GROUP PROJECT Table of Contents Executive Summary 3 1. Introduction 4 1.1 Purpose 4 1.2 Scope 4 1.3 Sources 4 2. Company Background 4 3. Benchmark 5 4. Capital Market Analysis 6 4.1 Share Ownership 6 4.2 Share Trading and Liquidity 9 4.2.1 Stock Liquidity 9 4.2.2 Bid-Ask Spread 10 4.3 52 Weeks High and Low 12 4.4 News and Disclosure Analysis 14 4.5 Analyst Coverage 17 5. Business Analysis 26 5.1 Macroeconomic Analysis 26 5.1.1 Economic Factors 26 5.1.1.1 GDP Growth 26 5.1.1.2 Exchange Rate 27 5.1.1.3 Interest Rate 28 5.1.2 Legal Factors 28 5.1.2 Market Factors 29 5.2 Industry Analysis 29 5.2.1 Rivalry Among Existing Companies 29 5.2.2 Threat of Substitutes or Services 30 5.2.2.1 Shale Gas 31 5.2.2.2 Biofuels and Renewable......

Words: 8004 - Pages: 33

Australia Beverages Limited

...Contents A. B. Introduction to Australia Beverages Limited March 2010................................ ................................ ... 2 The Australian bottled water manufacturing industry................................ ................................ ........... 2 1. Evolution of the Australian bottled water manufacturing industry................................ .................... 3 2. Bottled water manufacturing................................ ................................ ................................ ............ 4 2.1 Water supply ................................ ................................ ................................ ................................ .. 5 2.2 Treatment ................................ ................................ ................................ ................................ ...... 5 2.3 Bottling and labelling ................................ ................................ ................................ ...................... 5 2.4 Packaging ................................ ................................ ................................ ................................ ....... 5 3. Industry segmentation................................ ................................ ................................ ...................... 6 3.1 Still water ................................ ................................ ................................ ................................ ....... 6 3.2 Sparking water ......................

Words: 13403 - Pages: 54