The symptoms of this case are 2 employees, Millar and Boyce not meeting the daily quota of lengths. The team was not able to meet the deadline set by Parker because Millar and Boyce did not meet the daily goals. Since the deadline was not met, each team member would not receive the bonus of $300. Another symptom is Millar's lack motivation towards the end of the project.

The cause of the symptoms includes low daily wages, insufficient training, and inequality. Parker was not able to effectively coach Millar about how to meet his daily goal. The team's members received considerably low daily wages for the work they did, regardless of the amount of work they did or how long it took them to do it. No training was given on how to effectively meet the goals after several days of the goals not being met. Millar was demotivated because he realized if he met his quota he would not receive feedback and if he didn't meet his quota he would be yelled at by Parker. At times Millar was the only one scolded even when Boyce did not meet the quota either.

Millar and Boyce may have met the production goals if Parker would have given them appreciative coaching after he had checked their work on Day 3. Parker should have acknowledged that Millar did more on Day 4 than Day 3 and encouraged him to continue improving into Day 5. Millar was trying his best to meet the 7 ½ lengths but just could not reach it. Instead of Parker yelling and screaming at Millar, he should have focused on the positive and coach him on the positive aspects of his work. Also Parker should have discussed with Millar the possible reasons the goal was not being met and offer some suggestions on how to meet the goal.

Parker should have devised other ways to supplement their income since the wages were already low. Parker should have budgeted for one or two more days as to give the team ample time to…...

Similar Documents

Ob, Arctic Minings Consultants, Case Study

...ARCTIC MINING CONSULTANTS Case Synopsis Arctic Mining Consultants is a mining company that deals with mineral exploration. In this case study, the project given is staking 15 claims in Eagle Lake, Alaska. The project Manager was Tom Parker, who has a wide experience and specialized knowledge in all nontechnical aspects of mineral exploration. He is a geological field technician and field coordinator for Arctic Mining Consultants. He assigned his previous field assistants John Talbot, Greg Boyce and Brian Millar to help him complete the project. The job required them to stake at least 7 lengths each day in order to be completed on time. However, the whole team has became very tense and agitated, especially Tom Parker, as the deadline was just around the corner and there’s still many to be finished within the limited time. The problem became worse with the way Tom managed and treated his team. The only motivation to the team was the $300 bonuses promised by the company when the job is done on time, otherwise, they might wished to give up already. This happened because working as a field assistant and in long-working hours only giving them low wages, which is considered unreasonable compared to what they have to do. During the eight hard days, everything had actually proved the strengths and weaknesses of each of the team members, including Tom. Case analysis symptoms 1) What symptom(s) exist in this case to suggest that something has gone wrong? The symptom(s) to......

Words: 2346 - Pages: 10

Artic Mining Consultant

...2.2 Individual Written Assignment – Case Study Report Assignment Overview The purpose of the case study report is to help you bridge theoretical and practical applications of organisational behaviour topics, while also helping you build important written communication and problem-solving skills. Analysing a case study allows you to simulate some of the complexities and ambiguities that are present in real organisational problems and consider practical and evidence-based solutions. You will analyse the events in a case study (see below) and apply relevant OB principles to analyse the case. You will support your analysis with relevant OB research from at least 5 academic, peer-reviewed journal articles. The assignment is approximately 1500 words (not including title page or references) and is worth 25 marks. The assignment must be submitted via the LMS by 5pm on Friday, 30 November. Assignment Guidelines o Select one of the cases listed below. Both cases are printed in the McShane et al. (2010) textbook: o Arctic Mining Consultants (pages 616-619) o High Noon at Alpha Mill (pages 630-633) o Read the case carefully and write a report that includes the following elements: 1) Title Page (note: not included in word count) that includes • Your name & student ID number • Subject code and location (MGT2OBE, Montpellier) • Name of the case • Date of submission 2) Introduction and Conclusion • Include a separate introduction and conclusion paragraph. The......

Words: 1583 - Pages: 7

Industry Analysis of Coal Mining

...Industry Analysis- Coal Mining With respect to Duke energy and energy usage. Coal mining in the US continues to show growth even when coal consumption in the US continues to drop. Coal use for energy is decreasing at an increasing rate due to natural gas prices increasing and the country pushing for clean energy. http://mjperry.blogspot.com/ Natural Gas and Coal have come to an even total in use for America’s energy needs, which will continue to diminish this mature coal-mining market. Coal is also diminishing in value because of the greenhouse gasses coal emits when in use. Coal. is an extremely “dirty” energy source. http://greenworldpics.com This graphic shows the disparity in coal usage and coal CO2 emissions. This disparity is another reason many companies are leaving coal and causing the faster decline coal is experiencing. Coal Production • U.S. coal production in 2011 increased slightly from 2010, driven by export demand, to roughly 1.1 billion short tons. • Production in the Western Region, which includes Wyoming, totaled 587.6 million short tons, a 0.7 percent decline from 2010. • In 2011, productive capacity of coal mines increased by 2.5 million short tons to 1.3 billion short tons. • The average number of employees in U.S. coal mines increased 6.3 percent to 91,611. • Domestic coal consumption of metallurgical coal by the coking industry rose 1.6 percent to 21.4 million short tons. The average sales price of coal increased......

Words: 1479 - Pages: 6

Opininon Mining and Sentiment Analysis

...f, so, h, t), where o is a target object.  f is a feature of the object o.  so is the sentiment value of the opinion of the opinion holder h on feature f of object o at time t.  h is an opinion holder.  t is the time when the opinion is expressed OPINION MINING AND SENTIMENT ANALYSIS  Given a set of evaluative text documents D that contain opinions (or sentiments) about an object, opinion mining aims to extract attributes and components of the object that have been commented on in each document d ∈ D and to determine whether the comments are positive, negative or neutral. Sentiment analysis is a synonymous term.  TRY THESE!! “If you are reading this because it is your darling fragrance, please wear it at home exclusively, and tape the windows shut.” “Jane Austen‟s books madden me so that I can‟t conceal my frenzy from the reader. Every time I read „Pride and Prejudice‟ I want to dig her up and beat her over the skull with her own shin-bone.” - Mark Twain SOME CONCEPTS Sentiment polarity and degrees of positivity The binary classification task of labeling an opinionated document as expressing either an overall positive or an overall negative opinion  Joint topic-sentiment analysis  Term presence vs. frequency Presence is more important than frequency  SOME CONCEPTS Parts of speech Adjectives, adverbs, nouns, verbs  Negation “I like this book” and “I don‟t like this book” Similar but opposite! „No‟ does‟nt imply a negation. “No wonder......

Words: 603 - Pages: 3

Hr Strategies Case Analysis Report Global Mining

...Global Mining Human Resource Strategies Assessment 1: Case Analysis Report Word Count: 3,267 Table of Contents Table of Contents 2 Introduction 3 Key Human Resource issues at Global Mining 4 Trade Union intervention on human resource operations 4 Poor Performance Management 6 Strategies for Improvement 8 Introduce performance appraisal system 8 Problems forecasted for short & long term: 9 Pay for Performance 9 Problems forecasted for short & long term: 10 Develop a Human Resource Strategy 11 Problems forecasted for short & long term: 12 Conclusion 12 References 14 Introduction Global Mining (GM) is at a crossroads. They are aware that their Australian mine sites are unproductive and holding the company back in terms of profitability. High costs and low output are diluting the company’s overall financial performance and making them a target for takeover. A decision has been made to focus on improving the productivity of these sites rather than sell them off with the directors committing to providing HR strategy linked in with the organisational goals. It is clear from the information provided in the case study that the Australian issues relate to their human resources. The Production Director has identified that the physical resources are not the issue and with improvements, they could be a highly competitive site. The main issues relating to labour include; high labour costs with low flexibility, excessive penalty...

Words: 3764 - Pages: 16

Arctic Case Study - Geogaphy as-Level

...Arctic Case Study Produce a case study file on Global Warming in the Arctic You should include: i. A map/definition of the Arctic ii. Evidence for the extent of warming iii. Key environmental, social and economic changes iv. Are there any advantages to global warming in the Arctic? v. Global concerns. Definition The Arctic is a polar region at the top of the world in the northernmost region of the Earth. The Arctic consists of the Arctic Ocean and parts of Canada, Russia, the United States, Denmark, Norway, Sweden, Finland, and Iceland. Evidence for the extent of global warming The average Artic temperatures have risen at 2 times compared to the of the world with the increase being 3-4°c in the last 50 years. In the next 100 years people predict that temperature of land will rise by 3-5°c and 7°c over the oceans. The ice withdrawal was at it smallest ever with its biggest ever retreat since records began, US scientists have confirmed that this is true. Also the National Snow and Ice Data Center (NSIDC) said the extent of the retreat was 4.13 million sq km. which breaks all previous records breaking the previous record of 5.32 million sq km in 2005. This allowed the Northwest Passage to be declared open.  There are concerns that Arctic will shrink, and with the melting glaciers and other ice in Greenland, could soon contribute to a substantial rise in sea levels worldwide. And sea levels have risen significantly with the sea levels......

Words: 1109 - Pages: 5

Arctic Mining Consultants

...Case 2: ARCTIC MINING CONSULTANTS Case Synopsis Arctic Mining Consultants is a mining company that deals with mineral exploration. In this case study, the project given is staking 15 claims in Eagle Lake, Alaska. The project Manager was Tom Parker, who has a wide experience and specialized knowledge in all nontechnical aspects of mineral exploration. He is a geological field technician and field coordinator for Arctic Mining Consultants. He assigned his previous field assistants John Talbot, Greg Boyce and Brian Millar to help him complete the project. The job required them to stake at least 7 lengths each day in order to be completed on time. However, the whole team has became very tense and agitated, especially Tom Parker, as the deadline was just around the corner and there¶s still many to be finished within the limited time. The problem became worse with the way Tom managed and treated his team. The only motivation to the team was the $300 bonuses promised by the company when the job is done on time, otherwise, they might wished to give up already. This happened because working as a field assistant and in long-working hours only giving them low wages, which is considered unreasonable compared to what they have to do. During the eight hard days, everything had actually proved the strengths and weaknesses of each of the team members, including Tom. Summary of Case Project Team Tom Parker - geological field technician & field coordinator wide experience and specialized......

Words: 2504 - Pages: 11

Arctic Mining Consultants Solution

...the right channels. For instance in this case, it was very important for Parker to know how to express his dissatisfaction with the accomplishment of Miller in the right way without causing more problems. However, the way Parker was addressing the problem caused more misunderstanding between Parker and Miller which made their accomplishments to deteriorate rather than improving. Parker was too harsh on Miller and Boyce due to their poor performance instead of looking for ways to motivate them in order to improve their performance. Parker also failed to appreciate the improvement of the two when they worked extra harder to accomplish more than expected. This made it difficult for him to solve the problem. According to Bendersky (2007), it is necessary to follow the right procedures to express your grievances among your employees in order to address the problem properly. In organisation, human resource managers and other supervisors always have conflicts with the people working under them due to the conducts of these people, under performance and other problems. It is therefore important for the supervisor to use the right methods in order to solve the problem without creating more conflicts and hence the performance of these workers. Godse and Thingujam (2010) argue that it is important for those who are solving a problem to exercise emotional control and emotional intelligence in order for them to solve the conflict properly. In this case, it was important for Parker to......

Words: 374 - Pages: 2

Mining in Chile Case Study

...800 kilometers (500 miles) north of the country’s capital, Santiago. Chilean Mining Minister Laurence Golborne had arrived in Quito, Ecuador, at 9 p.m. that same day with Chilean President Sebastián Piñera on a state visit. At 11 p.m., Golborne’s smart phone came to life with a message whose brevity spoke urgency: “Mine cave-in, Copiapó; 33 victims.” Golborne informed the president the next morning and flew on commercial air flights to Lima, Peru, and then to Santiago. He then took a Chilean Air Force (FACH) flight to Copiapó, and, from there, he was driven some 45 kilometers to the mine, finally arriving at 3:30 a.m. on August 7. Piñera, a business-friendly Chilean president inaugurated on March 11, 2010, had recruited Golborne, an engineer, entrepreneur, and corporate executive, to serve as Chile’s minister of mines. Golborne had served as chief executive of Cencosud S.A., a large retail firm, and under his leadership, the company had increased annual sales ten-fold, entered the Brazilian, Colombian, and Peruvian markets, and opened two new business lines, including financial William and Jacalyn Edgar Professor of Management Michael Useem, The Wharton School, Adjunct Professor Rodrigo Jordan, School of Business Administration at Pontificia Universidad Católica de Chile, and Professor Matko Koljatic, School of Business Administration at Pontificia Universidad Católica de Chile, prepared this case as the basis for class discussion rather than to illustrate either effective...

Words: 13912 - Pages: 56

Mining Industry Case Analysis

...Mining Industry Case Analysis | Business Ethics in a Global Context | Presented To: Dr. Jang Singh | | | | Executive Summary This report will examine the Mining Industry via ethical perspectives. This report includes a brief overview of the industry followed by an evaluation of the Mining industry’s value chain; including an environmental analysis of a mining company, as well as an evaluation of the industry’s corporate social responsibility, corporate social responsiveness and finally the corporate social performance. The Mining Industry is one of the World’s largest industries. The ‘idea’ of mining dates back to the beginning stage of civilization. Some examples of early mining can be found in Egypt, Europe and the Philippines. As of now, top mining countries are South Africa, Russia, Australia, Ukraine and Guinea. This industry faces constant technology advancement, consequently it is an expensive investment, with large profit. The Mining Industry can be controversial when looked through an ethical lens. This Industry is analysed through four perspectives. * The utilitarianism perspective, an act is morally right if the outcome benefits the greatest amount of people; * The rights perspective, basically, important entitlements that should be respected and protected in every action; * The justice perspective, fair treatment of individuals in a situation where everyone is involved and gets what they deserve to; * The virtue perspective,......

Words: 9038 - Pages: 37

“Risk Management Analysis in the Mining Industry”

...on “Risk Management Analysis in the Mining Industry” Submitted by D Veera Bhadra Anjaneyulu (1226114112) Submitted to Prof Kalpagam Uma Shankar Visiting faculty of Gitam School of International Business Visakhapatnam Introduction The word "risk" comes from the Italian "risicare," meaning "to dare." Developing or acquiring a mine anywhere takes plenty of daring. Undertaking a mining project overseas borders on the foolhardy - unless you understand the risks and take steps to manage those risks. Every business endeavor carries some risk, and the astute businessman, over time, develops a sense of the kinds of risk presented by a business proposition, and a set of strategies designed to deal with those risks. Mining anywhere in the world has its own particular set of risks, in the form of commodity prices, engineering puzzles, and geologic uncertainty. When a company pursues mining on a global scale, additional risks arise, and things like political risk and currency risk come to the fore. Risk can be approached systematically, indeed scientifically, with statistical modeling and sophisticated mathematics. Few businesses make decisions based solely on the inevitability of mathematics, however. At the end of the day, a company must exercise its business judgment, based on its experience, and on what is most important to it, and make the hard decisions about how (or whether) to proceed. 1. Identifying Risks: The Risk Baseline: A mining company should......

Words: 2849 - Pages: 12

Arctic Mining Case Study

...Arctic Mining Case Study Tom Parker, 43, is now a field technician and coordinator for Arctic Mining Consultants. In the past he’s held various positions in non-technical aspects of mineral exploration. His past experiences include claim staking, line cutting, grid installation, soil sampling, prospecting, and trenching. For this project Parker will be acting as project manger though this is not his normal role. His responsibilities include hiring, training, and supervising a team of field assistants. Tom has hired 3 gentlemen who have worked for him on a past project at Eagle Lake, John Talbot, Greg Boyce, and Brian Millar. The project stipulates that within a seven day window the team stakes 15 claims, 60 miles in total, which would be an average of 7.5 lengths per day between the four team members. These stipulations also include mobilization and demobilization. Mr. Parker also informed the team members that each man would receive a $300 bonus, in addition to their wages, should the project be completed on time. Mr. Parker was angry with two of the team members, Millar and Boyce, who only completed six lengths a piece on the first day, while Parker and Talbot completed 7 lengths each. One the evening of the first day verbally expressed his anger and disappointment with Millar and Boyce. As the days went on the verbal abuse continued as Millar and Boyce continued to under produce compared to Parker and Talbot. Boyce improved his performance and Parker focused his anger......

Words: 1987 - Pages: 8

Data Mining Case Study

...las expectativas del cliente. Korl 8 está basado en la nube, ofrece un sinfín de aplicaciones para ayudar a las empresas a visualizar y obtener beneficios económicos de sus clientes, proporciona sistemas de geolocalización y además indica que clientes deben ser el foco para aplicar acciones que aumenten la lealtad de los mismos. 5 Información disponible en: http://www.bloomberg.com/news/articles/2016-01-10/why-disney-won-t-be-taking-magic-wristbands-toits-chinese-park 6 Tipos de Tecnología de CRM, disponible en: Dyché J.,”The CRM Handbook”. Addison-Wiley, Capítulo 1. 7 Información disponible en: http://www.fastcompany.com/3044283/the-messy-business-of-reinventing-happiness 8 Circulo Virtuoso del Data Mining y Habilidades del Data Miner. Berry, Linoff, Data Mining Techniques for Marketing, Sales and Customer. Cap1 PP. 1-26 9 Level 11 es una empresa de servicios de tecnología e ingeniería de productos de software expertos en diseño de la experiencia, la innovación y la invención de nuevas tecnologías. http://www.level11.com/about/ Además con el fin de almacenar, procesar, analizar y visualizar todos los datos que se generan a través del sistema MyMagic+, Disney creó una plataforma de datos basado en Hadoop, Cassandra y MongoDB 10. Se complementa con un conjunto de otras herramientas para casos de uso específicos 11. Resultados Gracias a la minería de datos y la forma tan eficiente de recolectar información Disney World logró transformar la tortuosa......

Words: 2043 - Pages: 9

Arc Inc. Consultant Case Analysis

...Arc, Inc.: A Consultant Case Analysis This paper is written in a perspective of business consultant analyzing the feasibility of a process engineering proposal concerning the introduction of a new line of silicon sensors and several proposed changes in the existing manufacturing process of the Silicon Sensors Assembly Room. Recommendations and alternatives regarding these two matters are also provided. Name_____________ Prof. Brendan Bannister 112 Hayden Hall Signature __________ Northeastern University Boston, MA 02115 Date______________ The business world keeps evolving rapidly, especially in the technology industry. As one of the leading producers and an early pioneer in the sensor technology industry, Arc Inc. is introducing a new line of Micro-Electromechanical System (MES) in order to not only meets customers’ new needs but also enlarges its market share. Therefore, the start-up of the assembly process required for manufacturing is critical. Meanwhile, a series of changes to improve the processes used in the current assembly of existing sensors in the Silicon Sensor Assembly Department (SSR) is necessary in order to increase profitability and efficiency of the company.......

Words: 1098 - Pages: 5

Arctic Mining Consultants Case Study

...Running head: Case Study Arctic Mining Consultants Case Study Situation Tom Parker has been hired by Arctic Mining Consultants. Tom has specialized knowledge and experience in all nontechnical aspects of mineral exploration, including claim staking, line cutting and grid installation, soil sampling, prospecting, and trenching. He will be responsible for hiring, training, and supervising programs. The field assistants are paid a low daily wages but meals and accommodations are provided. Project managers usually the ones that will run the operation the job sites but still will report to Tom Parker. Tom Parker was assigned a project to cut a claim post every 500 years. The 15 claim would require around 60 miles of line in total they have a time frame of seven days to complete the job. There will be four guys Parker, Talbot, Boyce, and Millar should complete around seven and half lengths per day. If they complete the job in seven days all the guys will be awarded $300.00 bonus. (McShane, S.L. & Von Glinow, M.A., 2010) Here is a breakdown of each day. Day one- The group was helicopter in and everyone sat down and looked over the schedule and created a plan how long it will take, the order in which the areas will be staked and locations for helicopter landing spots. They also tags areas that might be more difficult to stake. (McShane, S.L. & Von Glinow, M.A., 2010) Day two- Millar and Boyce completed six lengths and Talbot and Parker completed eight. ......

Words: 1884 - Pages: 8